Thermal Power Plants: Pre-Operational Activities covers practical information that can be used as a handbook by utility operators and professionals working in new and existing plants, including those that are undergoing refurbishments and those that have been shut for long periods of time. It is fully comprehensive, including chapters on flushing boiler systems, various methods of testing steam generators and drying out of generators. This book will be invaluable for anyone working on the start-up commissioning and operation of thermal power plants and is a companion book to Sarkar's Thermal Power Plant: Design and Operation. Sarkar has worked with thermal power plants for over 40 years and brings his experience in design and operations to help new and experienced practicing engineers perform effective pre-operational activities. Consolidates all pre-operational aspects of thermal power plantsExplains how to handle the equipment safely and work efficiently.Provides guidance for new and existing power plants to help you reduce outage time and save budget INDICE: 1. General Description of Thermal Power Plant 2. Quality Assurance and Quality Control (Applicable to Pre-Operational Activities) Part I: Pre-Operational Cleaning Of Various Sub-Systems 3. Alkali Flushing of Pre-Boiler System 4. Flushing of Fuel Oil Piping System 5. Blowing of Fuel Gas Piping System 6. Chemical Cleaning of Steam Generator 7. Flushing of Lube Oil Piping System 8. Steam/Air Blowing of MS, CRH, HRH and Other Steam Pipe Lines Part II: Activities That Make Critical Equipment Ready To Put Them In Service 9. Hydraulic Test of Steam Generator 10. Air-tightness/Leakage Test of Furnace, Air and Flue Gas Ducts of Steam Generator 11. Steam Generator Initial Firing and Drying-out of Insulation 12. Floating of Steam Generator Safety Valves 13. Clean Air Flow Test of Pulverizers 14. Condenser Flood Test and Vacuum Tightness Test 15. Generator Drying Out and Air-Tightness Test 16. Filling of Generator With Hydrogen and Protection Stability Test of Generator 17. Completion Test of the Power Station Appendix A: Brief Description on Performance Guarantee/Acceptance Tests Appendix B: General Safety Guidelines Appendix C: Tagging Procedure Appendix D
- ISBN: 978-0-08-101112-6
- Editorial: Elsevier
- Encuadernacion: Rústica
- Páginas: 300
- Fecha Publicación: 01/09/2016
- Nº Volúmenes: 1
- Idioma: Inglés